Track construction works of phases 2/A, 2/C, 3/A, 3/B, 4/A, 5/A, 5/D within the framework of the project entitled Modernization of the railway track and related facilities of the Székesfehérvár railway junction
F025 Komárom – Cable substructure construction on the Győr railway line section (GSM-R system)
Reconstruction of Fonyód – Kaposvár railway line section and construction of Balatonboglár station within the framework of the project for the reconstruction of the Szántód-Kőröshegy – Balatonszentgyörgy railway line
Development of Kaposvár – Osztopán Balatonboglárrailway line section and execution of leaking construction works on the Kaposvár – Osztopán line section (9 + 60 – 258 + 46) within the framework of the project for the reconstruction of the Szántód-Kőröshegy – Balatonszentgyörgy railway line
Leaking construction works at Balatonboglár station within the framework of the Project on the reconstruction of the Szántód-Kőröshegy – Balatonszentgyörgy railway line section
Platform construction works of Balatonboglár station within the framework of the Project on the reconstruction of the Szántód-Kőröshegy – Balatonszentgyörgy railway line section
Renovation of the Fonyód – Kaposvár line section as part of the Development of the Kaposvár fixed-track suburban network project including: construction of platform railing at Balatonföldvár, Balatonlelle and Fonyódliget station
Demolition and construction works at the Kaposvár – Osztopán Balatonboglár and construction works on the Kaposvár – Osztopán line section (9+60 – 258+46) within the frameworks of the project of the Renovation of the Fonyód – Kaposvár line section and the development of the Kaposvár fixed-track suburban network
Demolition and construction works of crossings at the Kaposvár – Osztopán Balatonboglár and construction works on the Kaposvár – Osztopán line section (9+60 – 258+46) within the frameworks of the project of the Renovation of the Fonyód – Kaposvár line section and the development of the Kaposvár fixed-track suburban network
Upload the Balatonboglár station, reloction of H fence, construction of stormwater drainage at the Kaposvár – Osztopán Balatonboglár and construction works on the Kaposvár – Osztopán line section (9+60 – 258+46) within the frameworks of the project of the Renovation of the Fonyód – Kaposvár line section and the development of the Kaposvár fixed-track suburban network
Replacement of 24 m rails including OH materials excluding delivery between Hortobágy – Ohat Pusztakócs Section 503-511.
Auxiliary superstructure works and reconstruction of tracks between Püspökladány and Ebes stations.
Loading of new and used concrete bottles from depot to wagon and from wagon to depot within the framework of the reconstruction of Püsköpladány – Ebes line section.
Carrying out the works of the water supply, leaking rib and leaking demolition within the framework of the renovation of the Fonyód – Kaposvár line section and the development of the Kaposvár fixed-track suburban network.
Carrying out the on-site works of the line branch of Fonyód station in connection with the railway line 30 within the within the framework of the renovation of the Fonyód – Kaposvár line section and the development of the Kaposvár fixed- track suburban network and the road construction project of Szántód-Kőröshegy – Balatonszentgyörgy Railway line section.
ET welding machine service within the frameworks of the project of the Renovation of the Fonyód – Kaposvár line section and the development of the Kaposvár fixed-track suburban network (125+19 – 249+02)
Substrate replacement and substrate repair works on the Mezőfalva – Paks line section
Hole repair works on the bases with TU signs on the Mezőfalva – Paks line section
Construction of battery trench cover within the frameworks of the project of the Renovation of the Fonyód – Kaposvár line section and the development of the Kaposvár fixed-track suburban network
Auxiliary superstructure works related to the reconstruction of large-track tracks and the construction of structures within the framework of the project Complete reconstruction of the Püspökladány – Ebes railway line section
Lading of new and used concrete from depot to wagon or from wagon to depot within the framework of the project Complete reconstruction of the Püspökladány – Ebes railway line section
Replacement of of 200 railway sleepers on the 45th, Sárbogárd – Börgönd line section on the territory of MÁV FKG KFT. Pécs Division
Railway construction on the Mezőzombor – Sátoraljaújhely line section (Olaszliszka – Tolcsva station, 224+00 – 235+00)
Construction of railway railings on the Hévízgyörk and the Galgahévíz station within the framework of the project Implementation of track construction and related works on the Gödöllő – Hatvan line section
ET welding machine service within the framework of the Szeged – Hódmezővásárhely tram – train establishment
2 x 10 m crane track extension and rail installation works at the establishment of FMF Kft., Püspökladány
Temporary track construction works at Gödöllő station within the framework of the project Implementation of track construction and related works on the Gödöllő – Hatvan line section
Carrying out substructure work in connection with the reconstruction of the station at the Mezőpeterd station on the 101st Püspökladány – Biharkeresztes – Országhatár line section in the Debrecen Division (1473+11 – 1484+00)
Platform and railing construction works at Hódmezővásárhely – Népkert station within the framework of the Szeged – Hódmezővásárhely tram – train establishment
Construction of a railway crossing on a private road closed to public traffic on the Tornanádaska -Országhatár railway line section (82+70,74)
Construction works of 820 running platform metres within the framework of the reconstruction of Mezőpeterd station.
Auxiliary superstructure works for track reconstruction and construction of structures within the framework of the project Complete reconstruction of the Ebes – Debrecen railway line section (2105 + 00 – 2181 + 50) and implementation of related works
Material-loading within the framework of the project Complete reconstruction of the Ebes – Debrecen railway line section (2105 + 00 – 2181 + 50) and implementation of related works
Demolition of a track on the railway line, construction of a temporary bypass track, relocation of the AS 487 crossing within the framework of the project of the M85 expressway between Nagylózs – Sopron-East, in addition, the construction tasks of the road, bridge, utilities and related facilities, and of the Nagycenki Plant Engineering (Part III) (on line 15 – 482+00 – 492+00)
Demolition of a track on the railway line, construction of a temporary bypass track, relocation of the AS 487 crossing within the framework of the project of the M85 expressway between Nagylózs – Sopron-East, in addition, the construction tasks of the road, bridge, utilities and related facilities, and of the Nagycenki Plant Engineering (Part III) (on line 15 – 482+00 – 492+00)
Demolition of tracks on 122 vfm (619+96 – 616+74) within the framework of the project Implementation of track construction and related works on the Gödöllő – Hatvan line section
Demolition and construction works at Tura station within the framework of the project Implementation of track construction and related works on the Gödöllő – Hatvan line section
Demolition and construction works at Tura station within the framework of the project Implementation of track construction and related works on the Gödöllő – Hatvan line section
Construction works of 820 running platform metres within the framework of the reconstruction of Mezőpeterd station.
Carrying out 498 concrete floor replacements in the Miskolc Division
Replacement of 2,759 railway sleepers on the network of GYSEV ZRT.
Construction works at Pécel – Isaszeg station within the framework of the Modernization of railway tracks and related facilities on the Rákos – Gödöllő line section
Station construction on the Hódmezővásárhely – Népkert mh, Algyő line section within the framework of the Szeged – Hódmezővásárhely tram – train establishment
Track construction work at Budapest, Keleti railway station next to Platform XIStation construction on the Hódmezővásárhely – Népkert mh, Algyő line section within the framework of the Szeged – Hódmezővásárhely tram – train establishment
Planning and construction of large railway works on the Szeged – Hódmezővásárhely tram – train line
Track construction on the H8 HÉV line between Kistarcsa – Kerepes (188 + 00 – 195 + 60)
Preparation of the construction plans and construction works within the framework of the project of the M85 expressway between Nagylózs – Sopron-East, in addition, the construction tasks of the road, bridge, utilities and related facilities, and of the Nagycenki Plant Engineering (Part III) (on line 15 – 482+00 – 492+00)
Replacement of the right and left rail on the H5 HÉV line between Pomáz and Szentendre