Skip to content
+36 20/335-6314 tigret@t-online.hu TI-GRÉT KFT. | 4171 Sárrétudvari, Bercsényi u. 17.
Client:
Project:
Year:
SDD KONZORIUM

Track construction works of phases 2/A, 2/C, 3/A, 3/B, 4/A, 5/A, 5/D within the framework of the project entitled Modernization of the railway track and related facilities of the Székesfehérvár railway junction

2014-2016
Dunántúli Távközlési és Biztosítóberendezési Építő Kft.

F025 Komárom – Cable substructure construction on the Győr railway line section (GSM-R system)

2015
R-KORD Építőipari Kft.

Reconstruction of Fonyód – Kaposvár railway line section and construction of Balatonboglár station within the framework of the project for the reconstruction of the Szántód-Kőröshegy – Balatonszentgyörgy railway line

2017
Swietelsky Vasúttechnika Kft.

Development of Kaposvár – Osztopán Balatonboglárrailway line section and execution of leaking construction works on the Kaposvár – Osztopán line section (9 + 60 – 258 + 46) within the framework of the project for the reconstruction of the Szántód-Kőröshegy – Balatonszentgyörgy railway line

2017
ALPOK TERRA KFT.

Leaking construction works at Balatonboglár station within the framework of the Project on the reconstruction of the Szántód-Kőröshegy – Balatonszentgyörgy railway line section

2017
ALPOK TERRA KFT.

Platform construction works of Balatonboglár station within the framework of the Project on the reconstruction of the Szántód-Kőröshegy – Balatonszentgyörgy railway line section

2017
Swietelsky Vasúttechnika Kft.

Renovation of the Fonyód – Kaposvár line section as part of the Development of the Kaposvár fixed-track suburban network project including: construction of platform railing at Balatonföldvár, Balatonlelle and Fonyódliget station

2017
Vasútgép Kft.

Demolition and construction works at the Kaposvár – Osztopán Balatonboglár and construction works on the Kaposvár – Osztopán line section (9+60 – 258+46) within the frameworks of the project of the Renovation of the Fonyód – Kaposvár line section and the development of the Kaposvár fixed-track suburban network

2017
Vasútgép Kft.

Demolition and construction works of crossings at the Kaposvár – Osztopán Balatonboglár and construction works on the Kaposvár – Osztopán line section (9+60 – 258+46) within the frameworks of the project of the Renovation of the Fonyód – Kaposvár line section and the development of the Kaposvár fixed-track suburban network

2017
R-KORD Építőipari Kft.

Upload the Balatonboglár station, reloction of H fence, construction of stormwater drainage at the Kaposvár – Osztopán Balatonboglár and construction works on the Kaposvár – Osztopán line section (9+60 – 258+46) within the frameworks of the project of the Renovation of the Fonyód – Kaposvár line section and the development of the Kaposvár fixed-track suburban network

2017
ZELE – BAU KFT.

Replacement of 24 m rails including OH materials excluding delivery between Hortobágy – Ohat Pusztakócs Section 503-511.

2017
SWIETELSKY VASÚTTECHNIKA KFT.

Auxiliary superstructure works and reconstruction of tracks between Püspökladány and Ebes stations.

2017
SWIETELSKY VASÚTTECHNIKA KFT.

Loading of new and used concrete bottles from depot to wagon and from wagon to depot within the framework of the reconstruction of Püsköpladány – Ebes line section.

2017
Mészáros és Mészáros Kft.

Carrying out the works of the water supply, leaking rib and leaking demolition within the framework of the renovation of the Fonyód – Kaposvár line section and the development of the Kaposvár fixed-track suburban network.

2017
R-KORD Építőipari Kft.

Carrying out the on-site works of the line branch of Fonyód station in connection with the railway line 30 within the within the framework of the renovation of the Fonyód – Kaposvár line section and the development of the Kaposvár fixed- track suburban network and the road construction project of Szántód-Kőröshegy – Balatonszentgyörgy Railway line section.

2017
C és R Közlekedésépítő Kft.

ET welding machine service within the frameworks of the project of the Renovation of the Fonyód – Kaposvár line section and the development of the Kaposvár fixed-track suburban network (125+19 – 249+02)

2017
DÉLI – VASÚT KFT.

Substrate replacement and substrate repair works on the Mezőfalva – Paks line section

2017
DÉLI – VASÚT KFT.

Hole repair works on the bases with TU signs on the Mezőfalva – Paks line section

2017
Első Dunántúli Útépítő Kft.

Construction of battery trench cover within the frameworks of the project of the Renovation of the Fonyód – Kaposvár line section and the development of the Kaposvár fixed-track suburban network

2017
SWIETELSKY VASÚTTECHNIKA KFT.

Auxiliary superstructure works related to the reconstruction of large-track tracks and the construction of structures within the framework of the project Complete reconstruction of the Püspökladány – Ebes railway line section

2018
SWIETELSKY VASÚTTECHNIKA KFT.

Lading of new and used concrete from depot to wagon or from wagon to depot within the framework of the project Complete reconstruction of the Püspökladány – Ebes railway line section

2018
DÉLI-VASÚT KFT.

Replacement of of 200 railway sleepers on the 45th, Sárbogárd – Börgönd line section on the territory of MÁV FKG KFT. Pécs Division

2018
VASÚTÉPÍTŐK KFT.

Railway construction on the Mezőzombor – Sátoraljaújhely line section (Olaszliszka – Tolcsva station, 224+00 – 235+00)

2018
SWIETELSKY VASÚTTECHIKA KFT.

Construction of railway railings on the Hévízgyörk and the Galgahévíz station within the framework of the project Implementation of track construction and related works on the Gödöllő – Hatvan line section

2018
SWIETELSKY VASÚTTECHIKA KFT.

ET welding machine service within the framework of the Szeged – Hódmezővásárhely tram – train establishment

2018
PROKERTECHNO KFT.

2 x 10 m crane track extension and rail installation works at the establishment of FMF Kft., Püspökladány

2018
SWIETELSKY VASÚTTECHIKA KFT.

Temporary track construction works at Gödöllő station within the framework of the project Implementation of track construction and related works on the Gödöllő – Hatvan line section

2018
DÉLI-VASÚT KFT.

Carrying out substructure work in connection with the reconstruction of the station at the Mezőpeterd station on the 101st Püspökladány – Biharkeresztes – Országhatár line section in the Debrecen Division (1473+11 – 1484+00)

2018
SWIETELSKY VASÚTTECHIKA KFT.

Platform and railing construction works at Hódmezővásárhely – Népkert station within the framework of the Szeged – Hódmezővásárhely tram – train establishment

2018
BORSOD DOLOMIT KFT.

Construction of a railway crossing on a private road closed to public traffic on the Tornanádaska -Országhatár railway line section (82+70,74)

2018
ZELE - BAU KFT.

Construction works of 820 running platform metres within the framework of the reconstruction of Mezőpeterd station.

2018
SWIETELSKY VASÚTTECHIKA KFT.

Auxiliary superstructure works for track reconstruction and construction of structures within the framework of the project Complete reconstruction of the Ebes – Debrecen railway line section (2105 + 00 – 2181 + 50) and implementation of related works

2018
SWIETELSKY VASÚTTECHIKA KFT.

Material-loading within the framework of the project Complete reconstruction of the Ebes – Debrecen railway line section (2105 + 00 – 2181 + 50) and implementation of related works

2018
DS KONZORCIUM

Demolition of a track on the railway line, construction of a temporary bypass track, relocation of the AS 487 crossing within the framework of the project of the M85 expressway between Nagylózs – Sopron-East, in addition, the construction tasks of the road, bridge, utilities and related facilities, and of the Nagycenki Plant Engineering (Part III) (on line 15 – 482+00 – 492+00)

2018
DS KONZORCIUM

Demolition of a track on the railway line, construction of a temporary bypass track, relocation of the AS 487 crossing within the framework of the project of the M85 expressway between Nagylózs – Sopron-East, in addition, the construction tasks of the road, bridge, utilities and related facilities, and of the Nagycenki Plant Engineering (Part III) (on line 15 – 482+00 – 492+00)

2018
SWIETELSKY VASÚTTECHIKA KFT.

Demolition of tracks on 122 vfm (619+96 – 616+74) within the framework of the project Implementation of track construction and related works on the Gödöllő – Hatvan line section

2018
SWIETELSKY VASÚTTECHIKA KFT.

Demolition and construction works at Tura station within the framework of the project Implementation of track construction and related works on the Gödöllő – Hatvan line section

2018
SWIETELSKY VASÚTTECHIKA KFT.

Demolition and construction works at Tura station within the framework of the project Implementation of track construction and related works on the Gödöllő – Hatvan line section

2018
ZELE - BAU KFT.

Construction works of 820 running platform metres within the framework of the reconstruction of Mezőpeterd station.

2018
ZELE - BAU KFT.

Carrying out 498 concrete floor replacements in the Miskolc Division

2018
Mészáros és Mészáros Kft.

Replacement of 2,759 railway sleepers on the network of GYSEV ZRT.

2018
STRABAG VASÚTÉPÍTŐ KFT.

Construction works at Pécel – Isaszeg station within the framework of the Modernization of railway tracks and related facilities on the Rákos – Gödöllő line section

2019
SWIETELSKY VASÚTTECHIKA KFT.

Station construction on the Hódmezővásárhely – Népkert mh, Algyő line section within the framework of the Szeged – Hódmezővásárhely tram – train establishment

2019
MÁV FKG KFT.

Track construction work at Budapest, Keleti railway station next to Platform XIStation construction on the Hódmezővásárhely – Népkert mh, Algyő line section within the framework of the Szeged – Hódmezővásárhely tram – train establishment

2019
SWIETELSKY VASÚTTECHIKA KFT.

Planning and construction of large railway works on the Szeged – Hódmezővásárhely tram – train line

2019
HÍD - TÁM KFT.

Track construction on the H8 HÉV line between Kistarcsa – Kerepes (188 + 00 – 195 + 60)

2019
DS KONZORCIUM

Preparation of the construction plans and construction works within the framework of the project of the M85 expressway between Nagylózs – Sopron-East, in addition, the construction tasks of the road, bridge, utilities and related facilities, and of the Nagycenki Plant Engineering (Part III) (on line 15 – 482+00 – 492+00)

2019
ZELE - BAU KFT.

Replacement of the right and left rail on the H5 HÉV line between Pomáz and Szentendre

2019